Destination Highlights Nordic XPO
In autumn 2022, we produced our first event at the newly opened Scandinavian XPO – Destination Highlights Nordic XPO. On behalf of Frisörföretagarna (Swedish Hairdressing Businesses), we developed design and technical solutions for the event in the exhibition hall, along with breakout rooms and lounges in adjacent spaces and the entrance.The main stage solution in Hall 1 used six display surfaces: three high-resolution LED screens on stage connected by our Edgetron fixtures, two projected screens on the sides showing the camera feed, and a 12 m panoramic screen above the catwalk showing a mix of presentation and camera. Above the stage, a massive lighting rig with 50 moving fixtures and additional Edgetrons.
At the back of Hall 1, we built breakout rooms and lounges – one of which also served as a nightclub.
Project photos
Our delivery
For this project we delivered:Sound
PA systems, wireless microphones, live band equipment and audio mixing for the main stage with conference and live artists, plus audio for the breakout rooms and lounges. Read more about soundLight
Ambient lighting across the entire exhibition hall, front lighting for the fashion and hair show, stage lighting with moving fixtures and Edgetron fixtures. Lighting for breakout rooms, lounges and the nightclub where Mashup Lab performed. Read more about lightVideo & LED
Six display surfaces: three high-resolution LED walls and three projected surfaces using Epson laser projectors. Video mixing and playout via a Watchout media server, plus camera production with studio cameras and Steadicam. Video technology also delivered for breakout rooms and lounges. Read more about video & ledDecor & Set Design
Stage decking, carpeting and room draping for the main stage. Two lounges of 300 sq m each, plus framing and carpeting in the entrance area. Read more about decor & set designCarpentry
A massive eight-metre-wide photo wall built in the entrance. Read more about carpentryPrint
Vinyl wrap for the photo wall and printed banners for framing and branding the entrance. Read more about printProject Management
Delivery and installation were coordinated by project manager Kebbe Kebbon. Read more about project management