For Nobel Week Dialogue 2022, we were commissioned to develop and deliver stage design and a complete technical solution with sound, light, image and camera by Nobel Prize Outreach. The event is a hybrid meeting with approximately 1,500 participants on site and is also broadcast worldwide on Youtube. Nobel Week Dialogue has been organized since 2012 and the 2022 edition was organized at Stockholm Waterfront Congress Center.Our solution consisted of a specially designed scenography with a combination of physical wooden materials, high-resolution LED walls and our own Edgetron fixtures. In front of the set, an oval plywood stage deck was built with a recessed ramp at the back and stage stairs to the right and left.
In addition to the set, we delivered a complete technical solution with audio for conferences and live streaming, as well as one for a performance with the artist Rufus Wainwright. The lighting department reinforced the house's lighting rig with more front lighting, and the house's imaging technology was supplemented with new projection screens, video control of all screens, and a camera production and equipment for live streaming.
Photos from the event
Nobel Week Dialogue 2022 is available on Youtube here:
Our delivery
To this project we delivered:SoundThe sound department supplemented the house's sound system with sound mixing for the participants on site and via live stream, as well as wireless microphones and technology for the artist Rufus Wainwright who performed during the program.
LightThe lighting department delivered Edgetron fixtures for the scenography, recessed lighting for the two milled "The Nobel Prize" logos on the right and left sides of the stage, and a supplement to the house's front lights with more moving fixtures.
VideoThe Video department delivered high-resolution LED screens as part of the scenography, new projection screens, image mixing and image control with a Watchout media server, presentation technology, livestream technology and a complete camera production with studio cameras.
DecorThe decoration department delivered matting for the stage deck and surrounding surfaces, as well as stage furniture.
CarpentryThe carpentry department produced and assembled all the wooden elements in the stage wall and the custom-built plywood stage.
PrintThe print department delivered cut-out logos for stage furniture and the stage, as well as foiling around the surfaces and the entrance.
Project ManagementPrior to delivery and once on site, the delivery and construction were coordinated by our project manager Andreas Bonnevier.